A Groundwork company - serving San Jose, CA
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Campbell, CA

New Detached ADU in Campbell - One Fixed Price, Permits Handled

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in San Jose
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Campbell, CA: What It Actually Costs and How Long It Takes

A new detached ADU in Campbell typically runs $90,000 to $220,000 and takes 8 to 12 months from first design meeting to move-in, with the bulk of that time sitting in City of Campbell plan review and inspection scheduling rather than in the build itself. A simple one-bedroom, one-bath unit on a flat, clear backyard lot often lands toward the low end; a two-bedroom with a full kitchen, vaulted ceiling and a private entry path pushes toward the top. Call (833) 988-3521 to schedule your free on-site estimate, and we’ll walk your lot and give you a written line-item range before you commit to anything.

Call (833) 988-3521

How a Detached ADU Build Actually Runs in Campbell

A second-story addition that matches the existing roofline

Detached units are their own permit, their own foundation and their own utility trench. That makes the sequence different from a garage conversion or an attached addition, and the order matters.

Stage 1 – Site walk and feasibility (1 to 2 weeks). We measure your lot, check setbacks, map the existing sewer lateral and water meter location, and confirm what your lot’s zoning will actually allow. You decide here: how big the unit is and roughly where it sits. In Campbell’s older neighborhoods, the setback and massing question gets answered before anything else, because the lot is small and there usually isn’t a second location to fall back on.

Stage 2 – Design and plan review (12 to 20 weeks, the long pole). Architectural drawings, structural calcs, energy compliance and the submittal package go in to the City of Campbell. Plan review is where Campbell projects stall compared to surrounding cities. You decide finish level and layout now, because changes after submittal restart the clock. If your property sits in or near the downtown or hillside design review area, add several weeks for that review and neighbor notification.

Stage 3 – Site prep and foundation (3 to 4 weeks). Demo of any existing shed, slab or old patio, grading, trenching for the utility run from the main house, then formwork and pour. You decide the utility route with us before we dig, since trenching under an existing driveway or mature tree changes the cost. This is where homeowners often pair the project with Concrete Driveways & Concrete Work in Campbell so the new unit has a clean path from the street.

Stage 4 – Framing through drywall (10 to 14 weeks). Framing, roofing, rough electrical, rough plumbing, rough HVAC, then insulation and drywall. Inspections land between each of these, and each inspection is a scheduled appointment, not a drop-in. Summer heat in the valley slows exterior work, so framing and roofing get front-loaded before June where possible.

Stage 5 – Finishes, final inspection, handoff (6 to 8 weeks). Cabinets, counters, tile, paint, flooring, fixtures, final inspection and a walkthrough. You make your finish selections back in stage 2, so this stage doesn’t become the bottleneck.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on a Detached ADU

  • Foundation type. Slab-on-grade is the default and cheapest route for a flat Campbell lot. A raised floor with a crawlspace costs more but handles uneven grading and makes future plumbing access easier. On a lot with the shallow slab-on-grade foundation common to postwar Campbell homes, grading is often the deciding factor.
  • Structure. Wood frame with stucco and a composition shingle roof is the regional standard and the least expensive. Hardie siding and a standing-seam metal roof cost more and hold up better over a 40-year horizon. The trade-off is upfront price against maintenance cycles.
  • Heating and cooling. A ductless mini-split is the usual pick for one or two zones and costs less to install than a full ducted system. Ducted makes sense when the unit is 700 square feet or more and you want even temperature throughout.
  • Kitchen level. A full kitchen with a range, vented hood and full-size fridge costs more than a kitchenette with a cooktop and under-counter fridge. If you’re renting to a long-term tenant, the full kitchen pays for itself; for a family member, a kitchenette often does the job.
  • Windows and doors. Standard vinyl double-pane windows are the common baseline. Impact-rated or higher-performance units cost more but cut summer heat gain in the valley, which matters on a west-facing wall from June through September.
  • Utility separation. A separate electrical meter for the ADU costs more upfront but makes future billing clean. A subpanel off the main house is cheaper and simpler. You decide this in stage 2, not during framing.
  • Entry and hardscape. A dedicated path and small patio add a few thousand and change how the unit lives. Homeowners often pair this with Paver Driveways in Campbell to tie the new entry into the existing yard.

What a New Detached ADU Costs in Campbell, CA

A framer checking new wall framing on a home addition

Plan on $90,000 to $220,000 for a detached unit in Campbell. That range covers most one- and two-bedroom builds on a clear, flat lot with standard finishes. A $45,000 to $130,000 range applies to lighter-scope work like a small studio unit or a project that reuses existing site infrastructure, but most buyers of a true detached ADU land inside the higher band.

What pushes you to the low end:

  • Unit under 500 square feet, simple rectangular footprint, no vaulted ceiling.
  • Flat, clear backyard with no mature trees, old slabs or sheds to remove.
  • Short trench run to existing utilities, no driveway or hardscape to cut through.
  • Standard finish level: composition shingle, stucco, vinyl windows, laminate counters.
  • Straightforward zoning with no design review overlay.

What pushes you to the high end:

  • Two bedrooms, full kitchen, in-unit laundry and a vaulted ceiling.
  • Longer utility trench, or the need to upgrade the main electrical service.
  • Design review or neighbor-notification requirements in the older downtown blocks.
  • Higher finish level: quartz counters, engineered hardwood, tile shower, custom cabinetry.
  • Sloped or tight lot requiring retaining walls or extra grading.

A written estimate from us shows line items for design, permit fees, site prep, foundation, framing, trades, finishes and the final inspection. It does not include the City of Campbell’s plan check and permit fees as a single number (those are pass-through, shown separately), and it doesn’t include landscape or fencing unless you ask us to scope it in. The number you see on the contract is the number you pay on a fixed-scope build. See the wider project scope on our Home Additions & ADU in Campbell page if your project overlaps with an attached addition or a different structure type.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Campbell Homes Specifically Do to a Detached ADU Build

Campbell is an old orchard town turned Silicon Valley bedroom community, and its housing stock shows it. Most lots in ZIP codes 95008, 95009 and 95011 carry 1950s and 1960s ranch homes on small parcels, with a pocket of century-old bungalows near downtown and newer infill townhomes on the edges. That mix matters for a detached ADU because the backyard is usually the only open ground on the property. When we open up the main house for the utility tie-in, we regularly find original knob-and-tube or early aluminum wiring and a shallow slab-on-grade foundation that needs a service upgrade before the new unit can share the meter. The City of Campbell enforces strict single-story-to-two-story transitional setbacks and massing review, and neighbors routinely get notice of projects that change the skyline – which is why a detached ADU here is often easier to get approved than a second-story addition, but still subject to articulation and screening review if the unit sits within sight lines of the street. Summer heat in the valley basin makes attic and exterior work harder from June through September, and the winter rain window compresses the roofing and stucco schedule. We plan around both when we lock the build calendar.

Serving Campbell, CA – Our Local Coverage Area

We serve Campbell and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Campbell

A new wood side gate with black hardware

Get a Free Estimate for Your Detached ADU in Campbell

Call (833) 988-3521 and we’ll schedule a free on-site estimate at your property in Campbell. On the call, a live person answers and books a time; on the visit, we walk your lot, check setbacks and utilities, and give you a written line-item range with the factors that would move it up or down. No pressure, no obligation, and no surprise numbers later. See our full Home Additions & ADU service if you’re still weighing a detached unit against other options.

Written by the team at Groundwork Construction Co.

Why Campbell Chooses Groundwork Construction Co. of San Jose

We set the standard for new detached ADU in Campbell.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Campbell

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Campbell Customers Say

Trusted by homeowners across Campbell and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porch

More services in Campbell

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in San Jose

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your San Jose team

A local vetted partner works across San Jose and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Campbell?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Campbell.

(833) 988-3521

Request a Free Estimate in Campbell

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch