Cabinets & countertops in Los Altos runs $14,000 – $45,000 for a full kitchen’s worth of new cabinetry and stone, and most projects take three to five weeks from demo to the last caulk line. The number moves with cabinet grade, stone choice, and whether we’re reworking the layout or fitting new boxes into the existing footprint. Call (833) 988-3521 for a free on-site estimate with a written line-item quote.
How We Run a Cabinet and Countertop Job Here

Cabinet and countertop work is a sequence, and the sequence is what keeps a kitchen from sitting torn apart for two months. Here’s how a typical Los Altos project moves.
Stage 1: Measure and finalize (day 1, about two hours). We template the room, check wall plumb and floor level, and confirm the layout. You decide the cabinet door style, finish, and box construction at this stage, because those choices drive a four-to-six-week lead time on semi-custom and custom lines. Stock cabinets can land in a week; Wellborn or a comparable semi-custom line runs longer.
Stage 2: Demo and rough-in (days 2 – 4). Old cabinets and countertops come out, and we open the walls where plumbing or electrical is moving. If the sink or range is staying put, this is a short stage. If you’re relocating the sink or adding a circuit for an induction range, the rough-in adds a day or two and pulls an inspection on the electrical and plumbing.
Stage 3: Cabinet install (days 5 – 7). Boxes go in level and shimmed, uppers get blocked to studs, and we set the crown and light rail. This is the stage where a crooked 1950s wall in an older Los Altos ranch shows up, and it’s why we check plumb on day one instead of discovering it with a level against a new cabinet.
Stage 4: Template and fabricate the stone (day 8, then five to seven days at the shop). Once cabinets are set, we template the countertop for a precise fit and send it to the fabricator. Cambria and Silestone both run on this schedule. You pick the slab and edge profile in stage one, so there’s no waiting on that decision now.
Stage 5: Install the top, set the sink, and finish (days 14 – 17). The countertop goes down, the sink and faucet get set, and we handle the final trim, toe kick, and any appliance panels. Backsplash is the one piece that can run after this, and it has its own page if you want detail on tile selection.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Weigh: Cabinets and Countertops
Most of the money and most of the second-guessing live in these decisions. Here’s the honest trade-off on each.
- Stock vs. semi-custom vs. custom cabinets. Stock is fastest and cheapest but limited to fixed sizes, which means filler strips against odd walls. Semi-custom (think Wellborn) lets you adjust widths and depths, adds about two weeks of lead time, and fits older rooms far better. Full custom buys you exactly what you draw and costs the most.
- Plywood vs. particleboard boxes. Plywood boxes hold up to moisture and re-screwing better; particleboard is cheaper and fine in a dry kitchen. In a home near the fog layer, we lean plywood.
- Quartz vs. natural stone. Cambria quartz is non-porous, needs no sealing, and holds a consistent pattern. Silestone sits in the same family. Granite is natural and heat-tolerant but wants sealing every year or two. Marble is beautiful and etches from lemon juice.
- Slab thickness and edge. A 2cm top with a built-up edge is lighter and cheaper than a 3cm slab. A mitered edge gives the thick look without the weight or the price of solid 3cm.
- Drawers vs. doors below. Full-extension drawers cost more per unit but make a base cabinet usable. We recommend them for pots and pantry storage.
What Cabinets & Countertops Costs in Los Altos, CA

Here’s where the money goes on a Los Altos job, line by line:
- Cabinet installation: $4,000 – $13,000
- Countertop installation: $2,000 – $6,500
- Kitchen island: $3,000 – $10,000
- Full scope (cabinets plus stone plus layout work): $14,000 – $45,000
Four variables push a job toward the high end. Size and run length matter most: a galley run and an island cost less than a wall of uppers and lowers around a banquet. Existing condition is second; a wall that’s out of plumb or a floor that dips means shimming and blocking time. Relocating plumbing or electrical adds a rough-in and an inspection. Material grade is the big lever: stock laminate-topped cabinets and a semi-custom quartz job can differ by $20,000 on the same floor plan.
A written estimate from us breaks out cabinet boxes, doors, hardware, stone slab and fabrication, install labor, and any rough-in, so you see each number. It doesn’t cover appliance cost, backsplash tile and install, or repairs discovered behind a wall once demo opens it. Estimates are free, and the number you sign is the number you pay unless you approve a change order.
See the difference
Before
After
Before
After
Before
AfterWhat Los Altos Homes Do to This Job
The housing stock here is the story. Most of the kitchens we open up sit inside 1940s – 1970s single-story ranch homes on large lots, and a lot of those have been expanded or rebuilt over the years. That means the wall behind the cabinets is sometimes two eras of framing meeting at an angle, and the electrical panel may need a service upgrade before it can carry an induction range and a dishwasher on the same circuit. The homes in 94022 and 94024 come with their own wrinkle: a protected heritage oak in the rear yard can dictate where a wall can go, so on a job that reaches the floor plan, we check tree-protection limits before we finalize a cabinet layout. Once plans cross into layout or structural change, the work pulls a permit and inspections, and we pull them and see them through. The marine fog layer off the Santa Cruz Mountains side is gentle, but it’s enough that we favor plywood boxes and non-porous quartz over a porous stone near a sink.
Serving Los Altos, CA – Our Local Coverage Area
We serve Los Altos and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Los Altos

Most run three to five weeks from demo to final install, with the stone fabrication window (five to seven days) sitting in the middle while cabinets are already set. Cabinet lead time before demo starts can add four to six weeks if you choose semi-custom lines. Call (833) 988-3521 for a schedule built around your chosen products.
A straight swap of cabinets and countertops in the same footprint generally does not require a permit. Moving plumbing, electrical, or a wall does, and so does a layout change that alters the structure. We confirm the scope on the estimate and pull the permit when it’s needed.
Yes, and that’s the most common path. Kept in the same footprint, the sink and range stay put, no rough-in is needed, and the job runs at the lower end of the range. The trade-off: the new layout has to respect the existing plumbing wall, so a different sink position isn’t on the table without the rough-in.
Cabinet installation alone runs $4,000 – $13,000, countertops $2,000 – $6,500, and a full scope with layout work $14,000 – $45,000. The estimating variables are size, existing condition, plumbing and electrical relocation, and material grade. Call (833) 988-3521 for an exact number; estimates are free.
Our workmanship is covered by the 730-Day Done Right Promise, one of the longest workmanship guarantees in the residential construction space. If it’s not done right, we make it right. Manufacturer warranties on cabinet lines and stone cover the materials separately.
Get a Free Estimate for Cabinets & Countertops in Los Altos
We’ll come to your Los Altos kitchen, measure the room, talk through cabinet and stone options, and leave you with a written line-item estimate. No pressure, no vague bids. Call (833) 988-3521 and a live person answers, day or night, to set a time. If the work grows into a broader scope, it’s all part of Kitchen Remodeling in Los Altos, and homeowners often pair a kitchen refresh with a Garage Conversion ADU in Los Altos.
Written by the team at Groundwork Construction Co.