A Groundwork company - serving San Jose, CA
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Los Altos, CA

ADU Site Prep & Utilities in Los Altos - One Fixed Price, Permits Handled

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in San Jose
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
New double-hung windows in a dining room
A new front yard fence with a matching gate
A new paver pool deck
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Los Altos: What the Job Actually Costs

ADU Site Prep & Utilities in Los Altos runs $45,000 – $130,000, and the site-and-utility portion alone is usually a five-to-eight-week stretch of work that starts long before any framing goes up. That money covers grading, excavation, the utility trench, the new electrical service, water and sewer tie-ins, and the drainage that keeps a sloped Los Altos lot dry through winter. Call (833) 988-3521 and we’ll walk your lot and give you a written line-item number, free.

Call (833) 988-3521

Stage by stage: how site prep and utilities come together

A finished backyard cottage with a small covered porch

Most homeowners picture the walls going up, but the part that determines whether the project survives its first rainy season happens in the ground. Here’s the real sequence, roughly how long each stage runs, and what you’re deciding at each point.

1. Site survey, staking, and utility locate (days 1 – 3)

We start by staking the actual footprint and calling for a locate on every buried line: gas, water, electric, sewer, and any irrigation the previous owner ran. On a mature Los Altos lot this is where we find the surprises, like a sewer lateral from 1962 that never got mapped or a roots-heavy line running right where the ADU needs to sit. You decide the final setback from the property line here, and if a heritage tree is anywhere near it, that conversation happens now, not after excavation.

2. Demolition, clearing, and grading (days 3 – 10)

Out come the old patio, the shed, the dead lawn, and any concrete that’s in the way. Grading follows, cut to the elevation the foundation plan calls for. On the sloped lots common off the Santa Cruz Mountains side of Los Altos, this stage often grows because winter drainage has to be designed in from the start. You’ll sign off on the finish grade before we form anything.

3. Excavation, trenching, and drainage (days 8 – 20)

This is the heaviest stretch. We trench for water, sewer, gas, and electrical conduit in one coordinated pass, then set the French drains, area drains, and the yard drain that ties to the storm system where the city allows it. The decision point: whether the sewer tie-in runs to the main at the street or connects to an existing lateral. The street tie can add serious money and weeks of coordination with the city.

4. Utility rough-in and inspection (days 18 – 35)

New conduit, a dedicated subpanel or full service upgrade, water line, sewer line, and gas run all get installed and then inspected before backfill. Nothing gets buried until the inspector signs off. You’ll pick your electrical service size and panel location here, and that choice depends on whether the ADU will have its own meter or sub-meter off the house.

5. Backfill, compaction, and final grade (days 32 – 45)

We backfill in lifts, compact to spec, and restore the yard to final grade so the slab or pier system can start on solid ground. You approve the finished surface and the drainage flow direction before we hand the site to the foundation crew. This is also when we coordinate anything else you’re doing outside, since homeowners often pair this with Concrete Driveways & Concrete Work in Los Altos while the equipment is already on site.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices you’ll actually make

  • Utility trench method: open trench is cheaper and faster but tears up the yard; directional boring costs more and leaves the lawn intact. On a tight Los Altos lot with a protected tree, boring is often the only option.
  • Electrical service: a dedicated meter panel runs more than sub-metering off the house, but it keeps the ADU independently billable and easier to rent. Sub-metering is cheaper up front and simpler to permit.
  • Drainage: basic French drains and grading handle most mild-slope lots; a full yard drain tied to the storm system costs more but is what actually holds up through a wet January.
  • Sewer connection: tying to an existing lateral is the budget path; a new street tie means city coordination, trenching under the sidewalk, and a much bigger line item.
  • Foundation interface: a slab is the economical choice on flat ground; a pier-and-beam or raised system costs more but suits sloped lots and lets you route utilities underneath cleanly.

What ADU Site Prep & Utilities costs in Los Altos, CA

A framer checking new wall framing on a home addition

Site prep and utilities for a detached ADU in Los Altos land between $45,000 and $130,000, and where you fall in that band comes down to five things. First, lot slope: a flat lot grades cheaply, a sloped one needs retaining and engineered drainage. Second, distance to the utility mains, since every extra foot of trench and conduit adds cost. Third, whether you need a street sewer tie versus an existing lateral. Fourth, grade of drainage and electrical systems, from basic to full storm-tie and dedicated service. Fifth, permit scope, because tree-protection review and utility coordination both add time and fees.

A written estimate from us itemizes grading, trench length, utility runs, drainage, inspection coordination, and restoration separately, and the number you see is the number you pay. What it typically does not include: the foundation itself, the ADU structure, and finish work, which live on the wider Home Additions & ADU in Los Altos scope. Compare that to full Home Additions & ADU budgets and you’ll see site work is the foundation of the whole number, not an add-on.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Los Altos lots specifically do to this job

Los Altos isn’t a subdivision town, it’s a tree-canopied Silicon Valley suburb where nearly every project is a rebuild or addition on a mature lot, and that changes site prep in ways a new-build lot never sees. Across 94022, 94024, and 94023, a protected heritage oak in the rear yard can dictate the entire footprint of the ADU before a single permit is pulled, and Santa Clara County’s heritage-tree ordinance plus the city’s single-story and floor-area limits mean we routinely re-engineer trench routes and drainage around a tree’s root zone. The housing stock, mostly 1940s-to-1970s ranch homes, often needs a panel or service upgrade and a fresh sewer lateral because the originals weren’t built for a second dwelling. Winter rains expose grading and waterproofing problems on sloped lots, so drainage design gets locked in early. We cover the whole of Los Altos and the surrounding streets, and we know what the inspectors here look for.

Serving Los Altos, CA – Our Local Coverage Area

We serve Los Altos and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked: ADU Site Prep & Utilities in Los Altos

A new multi-panel patio door opening a kitchen to the patio

Get a free on-site estimate

Site prep is the part of an ADU you can’t afford to guess at, and a free on-site estimate is where it gets clear. Call (833) 988-3521 and a live person answers, day or night. We’ll walk your Los Altos lot, flag the tree and drainage issues up front, and hand you a written line-item number with no change-order surprises.

Written by the team at Groundwork Construction Co.

Why Los Altos Chooses Groundwork Construction Co. of San Jose

We set the standard for ADU site prep & utilities in Los Altos.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Los Altos

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Los Altos Customers Say

Trusted by homeowners across Los Altos and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roofA new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsula

More services in Los Altos

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in San Jose

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your San Jose team

A local vetted partner works across San Jose and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Los Altos?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Los Altos.

(833) 988-3521

Request a Free Estimate in Los Altos

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch