A Groundwork company - serving San Jose, CA
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Los Gatos, CA

Garage Conversion ADU in Los Gatos - One Fixed Price, Permits Handled

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in San Jose
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Los Gatos: What It Takes and What It Costs

A garage conversion ADU in Los Gatos typically runs $45,000 to $130,000, with most projects landing in the $60,000 to $90,000 range depending on whether you’re moving plumbing, upgrading the panel, or rebuilding the slab. Plan on four to seven months from first permit submittal to final inspection, and longer if your lot sits in the hills above town where geotechnical review enters the picture. Call (833) 988-3521 for a free on-site estimate and a written line-item scope before you commit to anything.

Call (833) 988-3521

How a Garage Conversion ADU Comes Together, Stage by Stage

A garage converted into a guest room and home office

A garage conversion ADU is not a remodel with a bed dropped in. It’s a change of occupancy, and the sequence matters more than the finishes. Here’s what the work actually looks like from the first walkthrough to the final sign-off.

Stage 1: Site walk and feasibility, days 1 – 14

We measure the slab, check whether the existing footing will carry a new framed floor, and look at the electrical service, sewer lateral depth, and how your garage sits relative to the setback lines. In Los Gatos, this is also where a heritage tree or a slope on the lot can redraw the whole plan. You decide at this stage whether you’re converting the full bay or keeping a parking space, because that choice drives everything downstream.

Stage 2: Design and permit submittal, weeks 2 – 8

Drafting and engineering run three to six weeks, then plan check. Los Gatos ADU submittals move faster than they did a few years ago thanks to state preemption rules, but hillside lots in the 95033 ZIP still draw geotechnical review and fire-hardening plan detail. You sign off on the floor plan and the exterior finish selections here. This is also when you decide the kitchenette layout and where the mini-split condenser lands.

Stage 3: Demolition and rough-in, weeks 8 – 16

The overhead door comes out first, replaced with a framed wall and a window or glazed door. Then the slab: we either float a framed floor over a vapor barrier or grind and pour a self-leveling topping, because a garage slab slopes toward the door and code requires a level, moisture-controlled living surface. Plumbing and electrical rough-in follow, then framing for the new partition walls. You pick fixtures and appliances at the front end of this stage, not the back, because rough-in dimensions lock them in.

Stage 4: Insulation, drywall, and finish, weeks 16 – 26

Spray foam or batt, then drywall, then the trades stack up: flooring, tile, cabinetry, paint, fixtures, trim. Your finish selections drive the calendar here more than labor does. A standard quartz counter and stock vanity come together quickly; a custom cabinet run does not.

Stage 5: Inspections and closeout, weeks 26 – 30

Rough inspections already happened before drywall. Final inspections come after trim, HVAC commissioning, and the smoke/CO detector walk-through. We pull the permits and manage the inspection schedule so you’re not the one chasing the building department. Part of a full Home Additions & ADU in Los Gatos scope, a conversion shares the same permit clock as any larger addition you might be planning alongside it.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape Your Garage Conversion ADU

Most of the cost swing on this job lives in five decisions. Get these right early and the budget holds.

  • Slab versus framed floor: A self-leveling pour is cheaper up front; a framed floor with insulation stays warmer underfoot and hides plumbing runs without trenching concrete. Trade-off is roughly $4,000 to $9,000 either way, and framed floors suit hillside lots better.
  • Electrical service: If your panel has the capacity for a subpanel, you’re spending a few thousand. If the service needs an upgrade to carry an ADU separately metered, budget meaningfully more, and plan for the utility timeline.
  • Exterior cladding where the door was: Matching the existing stucco or siding to disappear the old door opening is a finish-quality decision. Homeowners in 95030 with wood-frame customs often choose to frame in a proper window and a glazed entry to read as intentional architecture, not a converted garage.
  • Windows and doors: Brands like CGI and ES Windows give solid thermal performance for the price; upgrade to ECO Window Systems if you want tighter frames and better noise control from the street. Each step up adds cost but pays back in comfort and resale.
  • Heating and cooling: A ductless mini-split is the standard choice. If the ADU will share the main house’s system, that’s a permit-scope decision made before rough-in.

What a Garage Conversion ADU Costs in Los Gatos, CA

A framer checking new wall framing on a home addition

Expect a garage conversion ADU in Los Gatos to land between $45,000 and $130,000. The low end is a clean, square garage with existing capacity in the panel and plumbing you can tie into without trenching. The high end is a hillside lot with a service upgrade, a rebuilt slab, a premium finish package, and geotechnical review on top of it.

What moves the number:

  • Size and configuration: A single-bay conversion is the modest end; a double-bay with a full kitchen and a separate bedroom pushes up.
  • Existing condition: Old slabs, undersized framing, or a garage that needs foundation work all add cost.
  • Moving plumbing and electrical: Tying into the main house close by is cheaper than trenching a new lateral or pulling a new service drop across the yard.
  • Finish grade: Stock cabinetry and quartz differ sharply from custom millwork and stone.
  • Permit and site scope: Heritage tree protection, slope, and fire-hardening details add plan review and site work.

A written estimate should include demolition, framing, rough and finish trades, permit fees, and inspections. It should not include furniture, appliances unless itemized, or landscaping outside the footprint. Call (833) 988-3521 and we’ll walk the garage and put a real number in writing.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Los Gatos Homes Specifically Do to This Job

Los Gatos is a small, wealthy foothill town wedged between the Santa Cruz Mountains and Silicon Valley. That geography is the whole story here. High-value custom homes on hillside lots in the 95030 and 95033 ZIPs run into strict tree-protection ordinances and slope review. A single protected oak or redwood can force a foundation or a utility trench to be redrawn before a shovel hits the ground. The wildland-urban interface along the mountain edge also pushes builders toward fire-resistant materials and defensible-space detailing on the exterior, and winter rain on steep lots makes drainage and erosion control a standing concern on every job. Add the housing mix: historic downtown and in-town homes from the early 1900s sit alongside large remodels in the foothills, so we see garages that need seismic and foundation retrofits before a conversion can be permitted. It’s not the flat-pad, clean-slab scenario a builder sees in San Jose. If your garage sits on a slope, plan for a retaining wall and pier-and-grade work in the estimate.

Serving Los Gatos, CA – Our Local Coverage Area

We serve Los Gatos and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked About Garage Conversion ADU in Los Gatos

A new concrete driveway with a paver border

Ready to Price Your Garage Conversion ADU in Los Gatos?

Call (833) 988-3521 to schedule a free on-site estimate for your garage conversion ADU in Los Gatos. A live person answers around the clock, and on the call we’ll gather the basics – garage size, panel capacity, sewer tie-in, lot slope – and book a walkthrough. You’ll get a written line-item quote with no surprises and a project schedule you can plan around.

Written by the team at Groundwork Construction Co. of San Jose.

Why Los Gatos Chooses Groundwork Construction Co. of San Jose

We set the standard for garage conversion ADU in Los Gatos.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Los Gatos

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Los Gatos Customers Say

Trusted by homeowners across Los Gatos and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new bay window with a cushioned seatA new wood side gate with black hardwareA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sink

More services in Los Gatos

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in San Jose

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your San Jose team

A local vetted partner works across San Jose and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Los Gatos?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Los Gatos.

(833) 988-3521

Request a Free Estimate in Los Gatos

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch