A Groundwork company - serving San Jose, CA
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Morgan Hill, CA

ADU Site Prep & Utilities in Morgan Hill - One Fixed Price, Permits Handled

The design-build pro we connect you with handles the design, the engineering, and the city permit, then builds it. One contract, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in San Jose
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Morgan Hill, CA: What It Takes and What It Costs

ADU site prep and utilities in Morgan Hill covers everything underground and structural before a single cabinet or fixture goes in: clearing and grading the site, running electrical service, water, sewer or septic tie-ins, gas if you want it, and drainage designed for the lot. Most projects here land between $45,000 and $130,000 for this phase alone, and the utility and grading work takes six to twelve weeks depending on how far you’re running lines and what the soil does. Call (833) 988-3521 for a free on-site estimate and a written, line-item quote.

Call (833) 988-3521

The Five Stages of an ADU Site Prep and Utilities Job, Start to Finish

A finished backyard cottage with a small covered porch

We run this work in a fixed order, and each stage has to pass before the next one starts. Here’s the real sequence, with the durations we schedule around in Morgan Hill.

Stage 1 – Site Visit and Utility Locate (Days 1 – 3)

A technician walks the lot with you, marks every existing line, and confirms where the ADU footprint can actually sit. We pull the utility locate through 811 and review your property survey. You decide the final building position and whether you’re tying into the main house’s sewer lateral, staying on a septic field, or adding a new tank. On foothill lots off Watsonville Road and the Holiday Drive area, that septic-versus-sewer call is the biggest early decision, and it can add days if a perk test is needed.

Stage 2 – Clearing, Demolition, and Rough Grading (Weeks 1 – 2)

We remove trees, old concrete, fencing, and any structures in the way, then cut the pad to grade. Rough grading on a sloped parcel is where the schedule gets honest: flat valley-floor lots move fast, while a site with 12 feet of fall takes longer and needs retaining and erosion control built in from the start. You’ll approve the finish grades and see where the cut and fill is going.

Stage 3 – Trenching and Underground Utilities (Weeks 2 – 5)

We trench for electrical conduit, water, sewer or septic line, and gas, then set the depth and slope the inspector requires. This is the stage that eats budget when the run from the meter or the street is long, since charging by the foot adds up fast on a big parcel. You decide on service ampacity (100 vs 200 amp), whether the gas line is worth running, and where the utility yard sits.

Stage 4 – Inspection and Backfill (Week 5 – 6)

The building department inspects the underground work before anything gets buried. We schedule it, meet the inspector on site, and backfill only after the sign-off. Trying to rush this step is the most common cause of a redo, so we don’t. You get the inspection card and the as-built utility map.

Stage 5 – Foundation Prep and Drainage (Weeks 6 – 10)

Final subgrade, forms, a vapor barrier, and rebar go in for the foundation, along with footing drains, swales, and any dry wells to move water away from the structure. If the ADU ties into a paver or hardscape plan, this is where we set the grades so water runs off the right way.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Shape an ADU Site Prep and Utilities Scope

The materials and systems you pick here decide both the price and how well the ADU holds up. These are the real trade-offs.

  • Septic vs. municipal sewer: A sewer lateral tie-in is usually the cheaper, lower-maintenance path on flat valley lots. A septic system suits rural parcels where no sewer reaches, but it costs more upfront and needs periodic pumping.
  • Electrical service – 100 amp vs. 200 amp: A 200-amp service covers all-electric appliances and future EV charging; 100 amp keeps cost down if the ADU is small and gas-fed. Running heavier conduit now is cheaper than pulling more later.
  • Private well vs. city water: Wells make sense on foothill parcels off the municipal system but add filtration and testing to the scope. City water is simpler where the line reaches the lot.
  • Foundation type: A slab-on-grade is the least expensive and works on level ground. A raised or stem-wall foundation handles slope and keeps framing out of moisture – worth the upcharge on a hillside lot.
  • Drainage and hardscape: Footing drains, dry wells, and properly graded swales protect the foundation. Homeowners often pair this with Paver Driveways in Morgan Hill so the ADU’s access and drainage are planned together.

What ADU Site Prep & Utilities Costs in Morgan Hill, CA

A framer checking new wall framing on a home addition

Expect $45,000 to $130,000 for the site prep and utilities phase of an ADU in Morgan Hill. Five things push a job toward the low or high end:

  • Lot and utility distance: Long runs from the meter or street on large foothill parcels drive trenching and material cost up.
  • Septic and well work: A new septic system or well with filtration can run well into five figures on its own.
  • Grading and earthwork: Steep sites need retaining walls, erosion control, and more machine time than a flat valley lot.
  • Service upgrades: A 200-amp service and gas line add cost but avoid future rework.
  • Permit and inspection scope: Grading permits, utility connects, and inspection fees are part of the number and vary with what the site triggers.

A written estimate itemizes earthwork, trenching, pipe and conduit, inspection fees, and permits separately so you see where the money goes. Items typically outside the number are the ADU building itself (that’s a separate scope), unforeseen rock or contamination found mid-dig, and any utility company charges beyond what the site visit reveals. Upfront pricing means the number you approve is the number you pay, backed by our 730-Day Done Right Promise.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Morgan Hill Lots Do to This Job

Morgan Hill sits where Silicon Valley’s build-out meets the agricultural south valley, and that shows up directly in site prep. Most of the land we prep is infill on former orchard and ranch parcels along the wine-country corridor near Monterey Road and up into the foothills – which means private wells, septic systems, and long driveway grades that simply don’t exist in flat tract work over in Gilroy or San Jose. The foothill custom lots routinely have septic fields to design and wells to test before we can even set a foundation. Hot, dry summers and fire-season scrutiny in the surrounding hills push owners and insurers toward Class A assemblies and noncombustible exterior choices at the design stage, and winter rains mean drainage and erosion control have to be right the first time on sloped ground. Older mid-century homes on large lots also bring aging utility systems that need to be checked before the ADU ties in. We handle this work across Morgan Hill, ZIP codes 95037 and 95038.

Serving Morgan Hill, CA – Our Local Coverage Area

We serve Morgan Hill and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Site Prep & Utilities in Morgan Hill

A new front yard fence with a matching gate

Get a Free Estimate for Your ADU Site Prep & Utilities in Morgan Hill

Every lot is different, and the only honest way to price this is to walk it. Call (833) 988-3521 and a live person answers around the clock. We’ll schedule a free on-site estimate, check your utilities and grades, and hand you a written line-item quote with permits and inspections spelled out. This is often part of a full Home Additions & ADU in Morgan Hill project, and it pairs naturally with Concrete Driveways & Concrete Work in Morgan Hill. Learn more about our Home Additions & ADU service, or call to get started.

Written by the team at Groundwork Construction Co.

Why Morgan Hill Chooses Groundwork Construction Co. of San Jose

We set the standard for ADU site prep & utilities in Morgan Hill.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

The local pro we connect you with is certified and meets all state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Morgan Hill

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

The local pro we connect you with does the work on the date in your quote, backed by a workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    A local pro comes out to measureLicensed and insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Morgan Hill Customers Say

Trusted by homeowners across Morgan Hill and surrounding areas.

★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
An open kitchen and dining area after a remodelA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver border

More services in Morgan Hill

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in San Jose

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your San Jose team

A local vetted partner works across San Jose and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Morgan Hill?

Call now for a free estimate, or request one below. The local pro we connect you with is licensed and insured, and here with fast after-hours help in Morgan Hill.

(833) 988-3521

Request a Free Estimate in Morgan Hill

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch